Bridges and monolithic structures

Reference filter
2019/04 - 2019/11
main-img20190513094826-1544.jpg
Reconstruction of the Roosevelt´s bridge in Pilsen It is a very important vault bridge in Pilsen which was built between 1848 - 1850. More information about the completion of the first stage published in the Silnice železnice (Roads and Railways) magazine Road Railway attached below.
2017/04 - 2019/06
main-20170117132557-901.jpg
General Patton´s Bridge in Plzeň On May 2nd, 1973, a new bridge, today General Patton´s Bridge, over the river Mže, was put into operation. The bridge helped divert the transit traffic from the square in the direction of Karlovy Vary and Žatec.
2018/06 - 2018/10
main-20180618100737-1128.jpg
I/10 Mýtiny, bridge 10-078 The bridge taking the I/10 road through the confluence of the Mumlava and Milnice rivers, consists of two plain fields. The total length of the supporting structure is 71.5 m.
2017/09 - 2018/10
main-ii104-davle-1-1151.jpg
II/104 Bridge over the Vltava river in Davle, reg. No. 104-001 The bridge in Davle municipality is situated at the confluence of the Vltava and Sázava rivers.
2015/04 - 2017/11
main-wp20160725103227pro-744.jpg
I/34 Božejov–Ondřejov–Pelhřimov Complete construction of a pre-stressed solid structure with a span of 29.500 m, pile foundation.
2015/06 - 2017/10
main-1-796.jpg
I/19 Žďákov, bridge ev. no. 19-028 The Žďákovský bridge, named after a village flooded during filling of the Orlík Reservoir, connects the banks of the Vltava River at the town of Orlík nad Vltavou.
2016/03 - 2017/10
main-image3-739.jpg
Reconstruction of the D1 motorway - 18th section, EXIT Měřín - V. Meziříčí west Reconstruction of bridge structures: Concrete work for new abutments and supports, installation of the load-bearing structure for the roadway, pavement layers and accessories.
2016/12 - 2017/10
main-img20170303101430-911.jpg
Štěrboholská connecting road – Fire Station Dolní Počernice The aim of the project is to ensure the protection of the area in Dolní Počernice and Štěrboholská against noise from Štěrboholská connecting road.

COLAS News

Jun 14

Biodiversity, the core theme of Colas Environment Day

On Thursday, June 9, Colas is holding its 2nd Environment Day across all its locations worldwide. This year, the event is dedicated to biodiversity, a major challenge for the Group, which launched a low-carbon and biodiversity strategy in 2020 to help preserve the planet.

Jun 6

Merger announcement - COLAS CZ, a.s. and Silnice Žáček, s.r.o. have merged

As of 31 May 2022, the merger of Silnice Žáček s.r.o., as the merging entity dissolved without liquidation, and COLAS CZ a.s., as the surviving entity, became effective.

Mar 16

Fiscal Year 2021 of the Group

The Board of Directors of Colas met to finalize the 2021 financial statements

Feb 23

Colas joins the #StOpE initiative to end everyday sexism in the workplace

On January 25, 2022, the Colas Group, represented by Frédéric Gardès, Chairman and CEO, joined #StOpE, an initiative dedicated to combatting so-called “everyday” sexism in the workplace. Colas is the first company in the construction sector to sign on to the program.

Dec 16

Colas renews its commitment to road safety

On Wednesday, December 8, Frédéric Gardès, Chairman and CEO of Colas, signed the "Seven Commitments for a Safer Road" with Marie Gautier-Melleray, France’s Interministerial Delegate for Road Safety. Over the last 24 years, Colas has been acting in partnership with public authorities to improve road safety, and will continue to play a strong role in the future with the new agreement.

Dec 6

Kácov bridge

The Kácov bridge project involves the construction of a new three-span road bridge with a total length of approximately 75 m over the Sázava River. COLAS CZ built the new bridge to replace the existing structure, which is no longer suitable due to poor condition, limited load capacity and unsuitable geometric parameters for traffic crossing.

Navigation

© 2022 COLAS CZ, a.s. All rights reserved