Notice - change of the company's registered office - newly at Rubeška 215/1, 190 00 Prague 9

Our works

Reference filter
2016/05 - 2016/06
main-img0879-645.jpg
I/20 Krásný Jez - Vodná Full-area roadway resurfacing of the I/20 road in a total length of 2,923 m. Renovation of the carriageway asphalt layer involved an overall area of 32,097 m2.
2016/04 - 2016/04
main-01-715.jpg
Repair of taxiway TWY A in the section from TWY B to TWY A1 This project involved the reconstruction of holding point THR24 and taxiway TWY A by replacing the surfacing and reinstalling the illuminated beacon lights adhered into penetrations into the new tarmac material.
2015/09 - 2016/03
main-imag3254-772.jpg
Bypass Sokolov – Svatava, phase 3 The construction solves the bypass of the city of Sokolov and the municipality of Svatava.
2014/08 - 2016/02
main-mesto-jihlava-ul-brnenska-ul-krizikova-rekonstrukce-620.jpg
Town of Jihlava, Brněnská St., Křižíkova St., reconstruction The project involved the reconstruction of the sewerage and water lines in the historical central of Jihlava, an area mined in the past.
2015/11 - 2015/12
main-operna-zed-mincovni-ul-lokalita-28-2-etapa-507.JPG
Retaining wall Mincovní St., location 28, 2nd stage The project concerned static safeguarding of Mincovní Street using an anchored micropile wall. The total secured length of the slope is 113 m.
2015/08 - 2015/11
main-14-672.jpg
D1 Renovation of carriageway km 199.3 – 204.6 on the left Renovation of the carriageway asphalt layer encompassed an overall area of 71,419 m2.
2013/04 - 2015/11
main-20160502120203-723.jpg
Modernization of the D1 highway, section 14, Exit 104 Větrný Jeníkov – Exit 112 Jihlava The work involved reconstruction of the formation including bridges, the drainage system and electrical and fibre optic cables.

COLAS News

Jun 18

Ceremonial opening of the workshop in Jihlava

On June 16th, 2020, the workshop in Jihlava was ceremoniously opened as part of the COLAS Group top management visit.

Jun 16

COLAS is building the road infrastructure for the future mobility development center in the Czech Republic

Colas CZ is currently building the road infrastructure for the Future Mobility Development Center in the western Czech city of Sokolov for the BMW group, as part of a joint venture with Colas Projects.

Jun 15

The most successful construction of road management in the Pardubice region

Reconstruction of the III/322 25 road Černá u Bohdanče I. stage, was nominated in The most successful projects competition. The project was carried out by the Pardubice region under the leadership of J. Neradílek (regional manager), together with Bauser CZ, a.s.

May 11

Change of company headquarters

As of 11 May 2020, a decision was taken by the Board of Directors to change the registered office of COLAS CZ. We look forward to seeing you at the company's new headquarters at Rubeška 215/1, 190 00 Prague 9 - Vysočany.

Apr 29

COLAS CZ buys Silnice Žáček s.r.o.

The family company Silnice Žáček s.r.o. is a major regional player based in Česká Lípa.

Apr 9

Reconstruction of the Roosevelt´s bridge in Pilsen

It is a very important vault bridge in Pilsen which was built between 1848 - 1850. More information about the completion of the first stage published in the Silnice železnice (Roads and Railways) magazine Road Railway attached below.

Navigation

© 2020 COLAS CZ, a.s. All rights reserved