COLAS CZ at the Chateau Garden in Oslavany

July 1, 2019

COLAS CZ executed the construction of Chateau Garden Oslavany - 2nd and 3rd stage worth CZK M 35.

Construction period: 10 months, (29.7.2018 - 31.5.2019)

Contractor:  COLAS CZ, a.s. as a general supplier

Subcontractors: BIOAQUA Ltd., PZO GROUP Ltd., PAMSTAV Ltd., JM Demicarr Ltd., KAVYL spol. s r.o., Ing. Jaroslav Zmeškal, Lubomír Votava Ltd., Confico Trading Ltd., HRAS - playground equipment s.r.o., hřiště.cz s.r.o., Radek Herold, Urbania s.r.o.

Description of works: execution of construction works - building of sports and recreation area of ​​the park with sports grounds, building of technical background with summer refreshment, with gazebo, terraces for sitting and bathing biotope with swimming and regeneration part.

Number of construction units: 20 units, the project divided into two stages

Construction parameters: total area of ​​the site - approx. 9,800 m2

  • bathing area - 1,200 m2 with approx. 1,450 m3 of water
  • biological part - 515 m2 with about 375 m3 of water
  • water games, paddling pool - 44 m2
  • paved area - 900 m2
  • multipurpose playground - 1,504 m2
  • fitness ground - 247 m2
  • trampoline - 10 m2
  • greenery - 4,262 m2
  • gardening - 600 m2
  • geopark - 518 m2
  • area fencing - 259 m

COLAS News

Aug 5

BMW PROVING GROUND

The construction season is in full swing, and we were very happy to welcome the top management of BMW to the construction site of the proving ground located near Sokolov.

Jun 30

COLAS CZ among the 3 TOP CONSTRUCTION COMPANIES in 2020!

Tomáš Krones, CEO of COLAS CZ, has received an award for the third place in the competition 2020 TOP CONSTRUCTION COMPANIES, which was presented by Minister of Transport Karel Havlíček.

Jun 8

COLAS is committed to reducing its carbon footprint

In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

May 3

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Apr 22

Safety campaign "This is not a war. We all have to survive"

In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

Apr 8

8/4/2021 - Environment Day of COLAS Group

The intention is to increase employees' awareness of climate change and its causes.

Navigation

© 2021 COLAS CZ, a.s. All rights reserved