Newsletter

COLAS is committed to reducing its carbon footprint

June 8, 2021
In response to the challenges posed by climate change, Colas has made a strong strategic commitment to decarbonizing its business activities. The Group has set itself an ambitious target, in line with the Paris Agreement: reducing its direct greenhouse gas emissions by 30% (scopes 1 and 2) and its indirect upstream emissions by 30% (scope 3a).

COLAS modernizes Senegal's Saint-Louis Airport

May 31, 2021
In cooperation with the Czech company Transcon Electronic Systems, COLAS is completely modernizing the first of Senegal's five regional airports, which has been in operation since the colonial era (1927).

COLAS CZ is reconstructing the road route from Vsetín to Rožnov through Valašská Bystřice

May 3, 2021
On May 3, an extensive reconstruction worth more than CZK 180 million was initiated between Velká Lhota and Valašská Bystřice.

Safety campaign "This is not a war. We all have to survive"

April 22, 2021
In connection with the spring construction season and loosened travelling within the Czech Republic, we will be happy to recall the campaign "We are not at war, we must survive" and again appealed to drivers to be considerate of our colleagues at sites as well as of the maintenance workers.

8/4/2021 - Environment Day of COLAS Group

April 8, 2021
The intention is to increase employees' awareness of climate change and its causes.

COLAS CZ realizes construction of a new bridge over Chlumecká Street in Prague 9

April 7, 2021
A new bridge over Chlumecká Street will be constructed on the Prague D0 ring road worth CZK 170 million.

Change of COLAS CZ, a.s. BOD members

April 1, 2021
With effect from 1 April 2021, the statutory body of COLAS CZ, a.s. is the following company BOD.

COVID-19 - we respond to the current development of the pandemic

February 26, 2021
We care about the health of our employees and try to do our best to protect them as much as possible at this time!

Construction of Southern Tangential tangential trunk road near České Budějovice municipality

January 8, 2021
Southern tangential trunk road will be performed by consortium of companies COLAS CZ a Firesta-Fišer.

COLAS CZ realizes D48 Bělotín - Nový Jičín project

December 27, 2020
ŘSD concluded a contract for the construction of 13 kilometers of a motorway worth CZK 3,084 BN, which will be realized by COLAS CZ, a.s. in association with FIRESTA-Fišer, rekonstrukce, stavby a.s.

COLAS News

Jun 14

Biodiversity, the core theme of Colas Environment Day

On Thursday, June 9, Colas is holding its 2nd Environment Day across all its locations worldwide. This year, the event is dedicated to biodiversity, a major challenge for the Group, which launched a low-carbon and biodiversity strategy in 2020 to help preserve the planet.

Jun 6

Merger announcement - COLAS CZ, a.s. and Silnice Žáček, s.r.o. have merged

As of 31 May 2022, the merger of Silnice Žáček s.r.o., as the merging entity dissolved without liquidation, and COLAS CZ a.s., as the surviving entity, became effective.

Mar 16

Fiscal Year 2021 of the Group

The Board of Directors of Colas met to finalize the 2021 financial statements

Feb 23

Colas joins the #StOpE initiative to end everyday sexism in the workplace

On January 25, 2022, the Colas Group, represented by Frédéric Gardès, Chairman and CEO, joined #StOpE, an initiative dedicated to combatting so-called “everyday” sexism in the workplace. Colas is the first company in the construction sector to sign on to the program.

Dec 16

Colas renews its commitment to road safety

On Wednesday, December 8, Frédéric Gardès, Chairman and CEO of Colas, signed the "Seven Commitments for a Safer Road" with Marie Gautier-Melleray, France’s Interministerial Delegate for Road Safety. Over the last 24 years, Colas has been acting in partnership with public authorities to improve road safety, and will continue to play a strong role in the future with the new agreement.

Dec 6

Kácov bridge

The Kácov bridge project involves the construction of a new three-span road bridge with a total length of approximately 75 m over the Sázava River. COLAS CZ built the new bridge to replace the existing structure, which is no longer suitable due to poor condition, limited load capacity and unsuitable geometric parameters for traffic crossing.

Navigation

© 2022 COLAS CZ, a.s. All rights reserved