Structural modifications of internal blocks between Lexova, Josefa Ressla and Jiránkova streets

The total area of the site was c. 30,000 m2.

Construction period: 2014/10 - 2015/08
Total value of the contract: 10 800 000 CZK excluding VAT

Revitalization of internal blocks, including new storm sewers in a length of 500 m, new public lighting in a length of 1,000 m2, two children's playgrounds, including playground equipment, parking areas and pavements covering an area of approximately 8,000 m2.

Repair of the sewerage system using a trenchless method in a length of 140 m (insertion of a sleeve saturated with resin using hydrostatic pressure of water, followed by slow cooling of the water overnight).

COLAS News

Dec 4

COLAS CZ, a.s. at the JobChallenge Job Fair

This year's job fair for students and graduates took place on 22.11.2017 in Brno and our company could not be missed like every year.

Dec 1

Breakfast with COLAS! - Students of the Secondary School of Civil Engineering in Mělník

On Wednesday, 15th November, we welcomed students to the headquarters of the company in Prague. This time visited us students of the 3rd year from Secondary School of Civil Engineering in Mělník.

Nov 13

COLAS Team Cup - CED Qualification Tournament - 5-a-side soccer - results

On Thursday November 9th,2017, COLAS CZ hosted the Central Europe Qualification Football Tournament within the frames of the COLAS Team Cup. 7 COLAS countries participated within the Central Europe Area (Czech Republic, Slovakia, Slovenia, Croatia, Rumania, Poland, Hungary).

Oct 12

COLAS Team Cup - CED Qualification Tournament - 5-a-side soccer

COLAS CZ hosts the CED Qualification Tournament held on 9.11.2017 in Prague.

© 2017 COLAS CZ, a.s. All rights reserved