Revitalization of internal blocks in Mládežnická St., Mladá Boleslav

The project concerned modification of internal block roads in Mládežnická St., Mladá Boleslav, the maximization of parking spaces and the modification of greenery between blocks of flats.

Construction period: 2014/07 - 2014/10
Total value of the contract: 17 346 237 CZK excluding VAT

Pavements with a separated area for cyclists and pedestrians were built in 17. listopadu St. and Jiráskova St., and the existing pavement in Mládežnická St. was extended. The modification of hard surfaces included drainage, protection of the utility lines, traffic signs and installation of new urban furniture.

Attachments

COLAS News

Jun 6

Award for COLAS CZ, a.s. in the 2017 TOP Building Company competition

On June, 2018, Tomáš Krones, Chairman od the Board of Directors of COLAS CZ, received an award for the second place in the 2017 TOP Building Company competition.

May 18

Professional internship from Hungary on the bridges

At the instigation of our talents, we provide internships to share experience between us and sister companies abroad.

May 17

Open Day in Bašnice

The Bašnice profit centre held an open day event on 28 April, 2018.

Apr 26

Marathon in Vienna with the participation of athletes from COLAS CZ

On Sunday, April 22, 2018, a marathon was held in Vienna, where four of our colleagues participated.

© 2018 COLAS CZ, a.s. All rights reserved