Revitalization of internal blocks in Mládežnická St., Mladá Boleslav

The project concerned modification of internal block roads in Mládežnická St., Mladá Boleslav, the maximization of parking spaces and the modification of greenery between blocks of flats.

Construction period: 2014/07 - 2014/10
Total value of the contract: 17 346 237 CZK excluding VAT

Pavements with a separated area for cyclists and pedestrians were built in 17. listopadu St. and Jiráskova St., and the existing pavement in Mládežnická St. was extended. The modification of hard surfaces included drainage, protection of the utility lines, traffic signs and installation of new urban furniture.

Attachments

COLAS News

Sep 14

We like supporting good things!

Since 2002 we have been contributing to the Jihlava Regional Charity which provides assistance and support to people in dire straigths.

Aug 10

Excursion in our quarry

On July 31, 2018, young firemen from Šluknov municipality visited the Šluknov Quarry where an excursion with the head of the quarry was prepared for them.

Jun 6

Award for COLAS CZ, a.s. in the 2017 TOP Building Company competition

On June 4th, 2018, Tomáš Krones, Chairman of the Board of Directors of COLAS CZ, received an award for the second place in the 2017 TOP Building Company competition.

May 18

Professional internship from Hungary on the bridges

At the instigation of our talents, we provide internships to share experience between us and sister companies abroad.

© 2018 COLAS CZ, a.s. All rights reserved