Retaining wall Mincovní St., location 28, 2nd stage

The project concerned static safeguarding of Mincovní Street using an anchored micropile wall. The total secured length of the slope is 113 m.

Construction period: 2015/11 - 2015/12
Total value of the contract: 9 508 488 CZK excluding VAT

The retaining wall was built using 6.7 - 7 m deep piles, 180 mm in diameter. The axial distance is 1.2 m. The borehole heads are terminated in a reinforced concrete strap anchor 500 mm thick, 900 mm high and 100 mm above the level of the existing road. Wood-steel crash barriers are installed along the wall. The existing retaining stone wall at the staircase in the northern part of the section was stabilized by the application of shotcrete C 25/30 with rebar reinforcement 100 x 100 anchored in the base. The executed works will increase the safety of the location, thus improving the standard of living in this part of Jáchymov.

COLAS News

Mar 24

I/62 road around former quarry, repair of the roadway

The I/62 road is the backbone of the Hřensko busy artery, its route lines the Elbe River.

Mar 20

COLAS CZ awarded a prize in the OHS field

During the Colas International Management Days, the Czech Republic was awarded by Safety Challenge 2019 for the best decrease in the accident frequency rate within the International division.

Dec 3

Revitalization of the area - II/210 Western bypass Sokolov-Svatava (Stage III)

The II/210 road is relocated along the western edge of the city from the Chebská intersection to the Kraslická one.

Nov 15

Reconstruction of the Plumlovská street

On 1/11/2019, a ceremonial opening to traffic of the project "Reconstruction of the Plumlovská street" in Prostějov was held.

Aug 28

COLAS CZ becomes a patron of the Secondary School in Nový Bydžov

We became a patron of the Secondary Technical and Craft School in Nový Bydžov.

Navigation

© 2020 COLAS CZ, a.s. All rights reserved