Retaining wall Mincovní St., location 28, 2nd stage

The project concerned static safeguarding of Mincovní Street using an anchored micropile wall. The total secured length of the slope is 113 m.

Construction period: 2015/11 - 2015/12
Total value of the contract: 9 508 488 CZK excluding VAT

The retaining wall was built using 6.7 - 7 m deep piles, 180 mm in diameter. The axial distance is 1.2 m. The borehole heads are terminated in a reinforced concrete strap anchor 500 mm thick, 900 mm high and 100 mm above the level of the existing road. Wood-steel crash barriers are installed along the wall. The existing retaining stone wall at the staircase in the northern part of the section was stabilized by the application of shotcrete C 25/30 with rebar reinforcement 100 x 100 anchored in the base. The executed works will increase the safety of the location, thus improving the standard of living in this part of Jáchymov.

COLAS News

Nov 15

Reconstruction of the Plumlovská street

On 1/11/2019, a ceremonial opening to traffic of the project "Reconstruction of the Plumlovská street" in Prostějov was held.

Aug 28

COLAS CZ becomes a patron of the Secondary School in Nový Bydžov

We became a patron of the Secondary Technical and Craft School in Nový Bydžov.

Aug 16

COLAS CZ on the D10 highway near Mladá Boleslav

We try to reduce the risk of traffic accidents at construction sites executed under traffic.

Jul 15

WATTWAY – a new life for roads

This is a unique project of the COLAS company. In principle, it is a "solar road", where the solar energy is used like in standard photovoltaic panels.

Jul 3

Photo contest "My dad works here!" launched

As part of the security campaign "My Dad Works Here!", in effect till the end of next year, a new Photo Contest has been launched in all countries of the COLAS Europe Group.

Navigation

© 2019 COLAS CZ, a.s. All rights reserved