The project concerned reconstruction of an existing cycle path in a length of approx. 320 m and a width of 4 m.

Construction period: 2015/08 - 2015/10
Total value of the contract: 1 745 298 CZK excluding VAT

The work included demolition of the existing concrete kerb and concrete troughs, installation of new concrete kerb, installation of a separation strip from interlocking pavers in a cement base and a new concrete surface in a thickness of 100 mm with scattered reinforcement. The project also involved the construction of a reinforced road with concrete surface in a thickness of 200 mm and scattered reinforcement, including sub-base layers and a concrete kerb. New connecting pavements for pedestrians and cyclists from interlocked paving were also built.

The basic areas:

Attachments

COLAS News

May 18

Professional internship from Hungary on the bridges

At the instigation of our talents, we provide internships to share experience between us and sister companies abroad.

May 17

Open Day in Bašnice

The Bašnice profit centre held an open day event on 28 April, 2018.

Apr 26

Marathon in Vienna with the participation of athletes from COLAS CZ

On Sunday, April 22, 2018, a marathon was held in Vienna, where four of our colleagues participated.

Apr 13

Second Corporate meeting of COLAS Group in CZ´s staff

The second Corporate meeting of COLAS CZ Group employees took place on March 20 and 21, 2018, at Hotel Harmony in Špindlerův Mlýn.

© 2018 COLAS CZ, a.s. All rights reserved