Repair of cycle path in the A. Brože section - a loop in Bělský forest

The project concerned reconstruction of an existing cycle path in a length of approx. 320 m and a width of 4 m.

Construction period: 2015/08 - 2015/10
Total value of the contract: 1 745 298 CZK excluding VAT

The work included demolition of the existing concrete kerb and concrete troughs, installation of new concrete kerb, installation of a separation strip from interlocking pavers in a cement base and a new concrete surface in a thickness of 100 mm with scattered reinforcement. The project also involved the construction of a reinforced road with concrete surface in a thickness of 200 mm and scattered reinforcement, including sub-base layers and a concrete kerb. New connecting pavements for pedestrians and cyclists from interlocked paving were also built.

The basic areas:

Attachments

COLAS News

Nov 8

General Patton´s Bridge in Plzeň opens to traffic

On Wednesday November 7th, 2018 the General Patton´s Bridge in Plzeň was opened to traffic. The bridge forms part of the main arterial road in the town centre.

Nov 2

Visit to our COLAS colleagues in Hungary

Our colleagues from Bridge and Reinforcement Agency visited two sites in Hungary.

Oct 30

Breakfast with COLAS! - Students of the Dušní Secondary School

Last week we were visited again by students from the 3rd year of the Dušní Secondary School.

Oct 8

Breakfast with COLAS! - Students of the Secondary School of Civil Engineering in Mělník

On Tuesday, September 25th, we visited the 4th and 3rd year students from the Secondary School of Civil Engineering in Mělník

© 2018 COLAS CZ, a.s. All rights reserved