Repair of cycle path in the A. Brože section - a loop in Bělský forest

The project concerned reconstruction of an existing cycle path in a length of approx. 320 m and a width of 4 m.

Construction period: 2015/08 - 2015/10
Total value of the contract: 1 745 298 CZK excluding VAT

The work included demolition of the existing concrete kerb and concrete troughs, installation of new concrete kerb, installation of a separation strip from interlocking pavers in a cement base and a new concrete surface in a thickness of 100 mm with scattered reinforcement. The project also involved the construction of a reinforced road with concrete surface in a thickness of 200 mm and scattered reinforcement, including sub-base layers and a concrete kerb. New connecting pavements for pedestrians and cyclists from interlocked paving were also built.

The basic areas:

Attachments

COLAS News

Feb 15

COLAS CZ supports EBEC

We decided to support the technical education of students at the Faculty of Civil Engineering of Brno University of Technology and we have become a guarantor of EBEC competition, where students will prove their knowledge in practice.

Feb 13

COLAS Team Cup - final results

The COLAS Team Cup World Finals were held on 7 and 8 February, 2018, in Paris.

Dec 4

COLAS CZ, a.s. at the JobChallenge Job Fair

This year's job fair for students and graduates took place on 22.11.2017 in Brno and our company could not be missed like every year.

Dec 1

Breakfast with COLAS! - Students of the Secondary School of Civil Engineering in Mělník

On Wednesday, 15th November, we welcomed students to the headquarters of the company in Prague. This time visited us students of the 3rd year from Secondary School of Civil Engineering in Mělník.

© 2018 COLAS CZ, a.s. All rights reserved