Reconstruction of II/189 Draženov, roundabout - Klenčí

The project concerned reconstruction of road II/189 from the junction with route I/26 in Draženov up to the junction with route II/198 in Klenčí pod Čerchovem, in a total length of 3,726 m.

Construction period: 2015/03 - 2015/06
Total value of the contract: 22 811 278,48 CZK excluding VAT

The total area of the repaired asphalt courses in the road structure was 31,783 m2.

The roadway was milled in the whole section to a depth of 90 mm and non-supportive spots were repaired. A new ACL 22 S base course was then laid in a thickness of 70 mm and ACO 11 S in a thickness of 40 mm. The construction included repairing and cleaning of 4 culverts, the construction of 2 new culverts, surface repair of the bridge (re-pavement, grouting), reinforcement of the verges and cleaning of ditches, partial replacement of kerbs, application of new horizontal marking and installation of new roadside delineators.

COLAS News

May 18

Professional internship from Hungary on the bridges

At the instigation of our talents, we provide internships to share experience between us and sister companies abroad.

May 17

Open Day in Bašnice

The Bašnice profit centre held an open day event on 28 April, 2018.

Apr 26

Marathon in Vienna with the participation of athletes from COLAS CZ

On Sunday, April 22, 2018, a marathon was held in Vienna, where four of our colleagues participated.

Apr 13

Second Corporate meeting of COLAS Group in CZ´s staff

The second Corporate meeting of COLAS CZ Group employees took place on March 20 and 21, 2018, at Hotel Harmony in Špindlerův Mlýn.

© 2018 COLAS CZ, a.s. All rights reserved