R10 right-hand lane Radonice – Hlavenec (stage 1), Tuřice – Benátky

The project addresses modernization of the right-hand traffic lane of the R10 expressway.

Construction period: 2018/04 - 2018/06
Total value of the contract: 71 062 753 CZK excluding VAT

The works involve:

• Reconstruction of the R10 motorway right-lane in km 9,985 - 14,375 (replacement of cover layers including remediation of base layer cracks)

• Expansion of the road at the points of extension of the branch / connecting strip according to the ČSN standards including relocation of large-area traffic signs

• Restoring traffic signs and adding safety-enhancing features

• Restoring and completing the safety device on the right edge of the road

• Repair of roadways, ie. "tearing" and reinforcement from asphalt recyclate

• Exchange of curb fittings for a monolithic drainage gutter including grid adjustment of existing inlets

• Cleaning of drainage devices (longitudinal ditches, passes)

• Deleting the ramp-up greenery, creating a fixed obstacle to traffic



The total length of the D10 - Stage 1 is 3.390 km.

COLAS News

Aug 28

COLAS CZ becomes a patron of the Secondary School in Nový Bydžov

We became a patron of the Secondary Technical and Craft School in Nový Bydžov.

Aug 16

COLAS CZ on the D10 highway near Mladá Boleslav

We try to reduce the risk of traffic accidents at construction sites executed under traffic.

Jul 15

WATTWAY – a new life for roads

This is a unique project of the COLAS company. In principle, it is a "solar road", where the solar energy is used like in standard photovoltaic panels.

Jul 3

Photo contest "My dad works here!" launched

As part of the security campaign "My Dad Works Here!", in effect till the end of next year, a new Photo Contest has been launched in all countries of the COLAS Europe Group.

Jul 1

COLAS CZ at the Chateau Garden in Oslavany

COLAS CZ executed the construction of Chateau Garden Oslavany - 2nd and 3rd stage worth CZK M 35.

Navigation

© 2019 COLAS CZ, a.s. All rights reserved