Puklice sewerage system and wastewater treatment plant

The project involved the construction of a gravity sanitary sewerage system in the towns of Puklice and Studénky.

Construction period: 2014/09 - 2015/09
Total value of the contract: 89 422 446 CZK excluding VAT

The project for the 9,032 m system also included repairs to the surface of regional and local roads and the construction of a new mechanical-biological wastewater treatment plant with technological equipment and a capacity of 1,000 population equivalents.

Attachments

COLAS News

Nov 15

Reconstruction of the Plumlovská street

On 1/11/2019, a ceremonial opening to traffic of the project "Reconstruction of the Plumlovská street" in Prostějov was held.

Aug 28

COLAS CZ becomes a patron of the Secondary School in Nový Bydžov

We became a patron of the Secondary Technical and Craft School in Nový Bydžov.

Aug 16

COLAS CZ on the D10 highway near Mladá Boleslav

We try to reduce the risk of traffic accidents at construction sites executed under traffic.

Jul 15

WATTWAY – a new life for roads

This is a unique project of the COLAS company. In principle, it is a "solar road", where the solar energy is used like in standard photovoltaic panels.

Jul 3

Photo contest "My dad works here!" launched

As part of the security campaign "My Dad Works Here!", in effect till the end of next year, a new Photo Contest has been launched in all countries of the COLAS Europe Group.

Navigation

© 2019 COLAS CZ, a.s. All rights reserved