III/27935 Sobotka – Podkost

Reconstruction of road III/27935 between Sobotka and Podkost in the length of 3,555.7 m including reconstruction of culverts and repair of road edges.

Construction period: 2016/08 - 2017/07
Total value of the contract: 21 250 000 CZK excluding VAT

It is a road with high tourist traffic to Kost Castle located in the protected landscape area of Bohemian Paradise and the urban monument zone of Sobotka, Vesec u Sobotky and Podkost.

The construction will proceed under full closure in two stages. In 2016, a stretch from the intersection of route III/27935 and route III/29730 (the Libošovice direction) to Podkost will be executed. In 2017, a stretch from Sobotka to the intersection of route III27935 and route III/29730 (the Libošovice direction) will be executed.

Works to be implemented:

-          application of asphalt layers: 6,062.0 t

-          reconstruction of culverts: 296.5 m

COLAS News

Dec 4

COLAS CZ, a.s. at the JobChallenge Job Fair

This year's job fair for students and graduates took place on 22.11.2017 in Brno and our company could not be missed like every year.

Dec 1

Breakfast with COLAS! - Students of the Secondary School of Civil Engineering in Mělník

On Wednesday, 15th November, we welcomed students to the headquarters of the company in Prague. This time visited us students of the 3rd year from Secondary School of Civil Engineering in Mělník.

Nov 13

COLAS Team Cup - CED Qualification Tournament - 5-a-side soccer - results

On Thursday November 9th,2017, COLAS CZ hosted the Central Europe Qualification Football Tournament within the frames of the COLAS Team Cup. 7 COLAS countries participated within the Central Europe Area (Czech Republic, Slovakia, Slovenia, Croatia, Rumania, Poland, Hungary).

Oct 12

COLAS Team Cup - CED Qualification Tournament - 5-a-side soccer

COLAS CZ hosts the CED Qualification Tournament held on 9.11.2017 in Prague.

© 2018 COLAS CZ, a.s. All rights reserved