III/27935 Sobotka – Podkost

Reconstruction of road III/27935 between Sobotka and Podkost in the length of 3,555.7 m including reconstruction of culverts and repair of road edges.

Construction period: 2016/08 - 2017/07
Total value of the contract: 21 250 000 CZK excluding VAT

It is a road with high tourist traffic to Kost Castle located in the protected landscape area of Bohemian Paradise and the urban monument zone of Sobotka, Vesec u Sobotky and Podkost.

The construction will proceed under full closure in two stages. In 2016, a stretch from the intersection of route III/27935 and route III/29730 (the Libošovice direction) to Podkost will be executed. In 2017, a stretch from Sobotka to the intersection of route III27935 and route III/29730 (the Libošovice direction) will be executed.

Works to be implemented:

-          application of asphalt layers: 6,062.0 t

-          reconstruction of culverts: 296.5 m

COLAS News

Dec 4

Visit to the Polish Rogoźnica quarry

On 8th-9th November, 2018, 4 our colleagues from Quarries Agency, involved in the talent program, took part in the internship at the Rogoźnica quarry.

Nov 8

General Patton´s Bridge in Plzeň opens to traffic

On Wednesday November 7th, 2018 the General Patton´s Bridge in Plzeň was opened to traffic. The bridge forms part of the main arterial road in the town centre.

Nov 2

Visit to our COLAS colleagues in Hungary

Our colleagues from Bridge and Reinforcement Agency visited two sites in Hungary.

Oct 30

Breakfast with COLAS! - Students of the Dušní Secondary School

Last week we were visited again by students from the 3rd year of the Dušní Secondary School.

© 2018 COLAS CZ, a.s. All rights reserved