III/27935 Sobotka – Podkost

Reconstruction of road III/27935 between Sobotka and Podkost in the length of 3,555.7 m including reconstruction of culverts and repair of road edges.

Construction period: 2016/08 - 2017/07
Total value of the contract: 21 250 000 CZK excluding VAT

It is a road with high tourist traffic to Kost Castle located in the protected landscape area of Bohemian Paradise and the urban monument zone of Sobotka, Vesec u Sobotky and Podkost.

The construction will proceed under full closure in two stages. In 2016, a stretch from the intersection of route III/27935 and route III/29730 (the Libošovice direction) to Podkost will be executed. In 2017, a stretch from Sobotka to the intersection of route III27935 and route III/29730 (the Libošovice direction) will be executed.

Works to be implemented:

-          application of asphalt layers: 6,062.0 t

-          reconstruction of culverts: 296.5 m

COLAS News

Nov 15

Reconstruction of the Plumlovská street

On 1/11/2019, a ceremonial opening to traffic of the project "Reconstruction of the Plumlovská street" in Prostějov was held.

Aug 28

COLAS CZ becomes a patron of the Secondary School in Nový Bydžov

We became a patron of the Secondary Technical and Craft School in Nový Bydžov.

Aug 16

COLAS CZ on the D10 highway near Mladá Boleslav

We try to reduce the risk of traffic accidents at construction sites executed under traffic.

Jul 15

WATTWAY – a new life for roads

This is a unique project of the COLAS company. In principle, it is a "solar road", where the solar energy is used like in standard photovoltaic panels.

Jul 3

Photo contest "My dad works here!" launched

As part of the security campaign "My Dad Works Here!", in effect till the end of next year, a new Photo Contest has been launched in all countries of the COLAS Europe Group.

Navigation

© 2019 COLAS CZ, a.s. All rights reserved