III/27935 Sobotka – Podkost

Reconstruction of road III/27935 between Sobotka and Podkost in the length of 3,555.7 m including reconstruction of culverts and repair of road edges.

Construction period: 2016/08 - 2017/07
Total value of the contract: 21 250 000 CZK excluding VAT

It is a road with high tourist traffic to Kost Castle located in the protected landscape area of Bohemian Paradise and the urban monument zone of Sobotka, Vesec u Sobotky and Podkost.

The construction will proceed under full closure in two stages. In 2016, a stretch from the intersection of route III/27935 and route III/29730 (the Libošovice direction) to Podkost will be executed. In 2017, a stretch from Sobotka to the intersection of route III27935 and route III/29730 (the Libošovice direction) will be executed.

Works to be implemented:

-          application of asphalt layers: 6,062.0 t

-          reconstruction of culverts: 296.5 m

COLAS News

Jun 6

Award for COLAS CZ, a.s. in the 2017 TOP Building Company competition

On June, 2018, Tomáš Krones, Chairman od the Board of Directors of COLAS CZ, received an award for the second place in the 2017 TOP Building Company competition.

May 18

Professional internship from Hungary on the bridges

At the instigation of our talents, we provide internships to share experience between us and sister companies abroad.

May 17

Open Day in Bašnice

The Bašnice profit centre held an open day event on 28 April, 2018.

Apr 26

Marathon in Vienna with the participation of athletes from COLAS CZ

On Sunday, April 22, 2018, a marathon was held in Vienna, where four of our colleagues participated.

© 2018 COLAS CZ, a.s. All rights reserved