III/0164 Řepov – through road

The project documentation contains the construction of the III/0164 road at the through road of the village of Řepov in the length of approx. 1,250 m.

Construction period: 2017/10 - 2018/08
Total value of the contract: 24 969 373 CZK

It involves the entire section of the traffic station of this road.

The construction of the stretch in the above-mentioned range includes the complete construction of the road layers, incl. subsoil adjustments. It also includes replacement of pavement curbs affected by the project, the restoration of the horizontal marking and the width adjustment of the roadway in place of the existing pedestrian crossings. At the end of the construction changes, the existing roadway will be extended within the road body.

COLAS News

Nov 8

General Patton´s Bridge in Plzeň opens to traffic

On Wednesday November 7th, 2018 the General Patton´s Bridge in Plzeň was opened to traffic. The bridge forms part of the main arterial road in the town centre.

Nov 2

Visit to our COLAS colleagues in Hungary

Our colleagues from Bridge and Reinforcement Agency visited two sites in Hungary.

Oct 30

Breakfast with COLAS! - Students of the Dušní Secondary School

Last week we were visited again by students from the 3rd year of the Dušní Secondary School.

Oct 8

Breakfast with COLAS! - Students of the Secondary School of Civil Engineering in Mělník

On Tuesday, September 25th, we visited the 4th and 3rd year students from the Secondary School of Civil Engineering in Mělník

© 2018 COLAS CZ, a.s. All rights reserved