III/0164 Řepov – through road

The project documentation contains the construction of the III/0164 road at the through road of the village of Řepov in the length of approx. 1,250 m.

Construction period: 2017/10 - 2018/08
Total value of the contract: 24 969 373 CZK

It involves the entire section of the traffic station of this road.

The construction of the stretch in the above-mentioned range includes the complete construction of the road layers, incl. subsoil adjustments. It also includes replacement of pavement curbs affected by the project, the restoration of the horizontal marking and the width adjustment of the roadway in place of the existing pedestrian crossings. At the end of the construction changes, the existing roadway will be extended within the road body.

COLAS News

May 18

Professional internship from Hungary on the bridges

At the instigation of our talents, we provide internships to share experience between us and sister companies abroad.

May 17

Open Day in Bašnice

The Bašnice profit centre held an open day event on 28 April, 2018.

Apr 26

Marathon in Vienna with the participation of athletes from COLAS CZ

On Sunday, April 22, 2018, a marathon was held in Vienna, where four of our colleagues participated.

Apr 13

Second Corporate meeting of COLAS Group in CZ´s staff

The second Corporate meeting of COLAS CZ Group employees took place on March 20 and 21, 2018, at Hotel Harmony in Špindlerův Mlýn.

© 2018 COLAS CZ, a.s. All rights reserved