II/405 road through Zašovice

Reconstruction of the class II road in a length of 1,300 m.

Construction period: 2014/03 - 2014/12
Total value of the contract: 16 240 473,78 CZK excluding VAT

Reconstruction of the class II road in a length of 1,300 m involved milling of the old asphalt cover, extension of the roadway, cold recycling of the existing base courses and laying of a new system of asphalt courses. 800 m2 of pavement and 1,000 m of kerb were installed and the old sewerage system in Zašovice was reconstructed.

Attachments

COLAS News

Aug 2

I/34 Božejov-Ondřejov-Pelhřimov bypass opens to traffic

On Tuesday August 1st, 2017, a new section of the I/34 road between Božejov and Pelhřimov was opened to traffic.

Jun 30

COLAS Team Cup - qualification five-a-side soccer

This year, Mr. Hervé Le Bouc, CEO and Chairman of the COLAS Management Board, decided to create a worldwide in-house sports event, called Colas Team Cup. Two sport were chosen - five-a-side soccer and running.

Apr 19

COLAS CZ, a.s. and Čermák and Hrachovec a.s. at the iKariéra 2017 Job Fair in Brno

On April 11, 2017 we attended the job fair iKariéra at the Faculty of Business and Management at the University of Technology in Brno.

Apr 6

COLAS CZ, a.s. and Čermák a Hrachovec a.s. at the iKariéra 2017 Job Fair in Prague

On March 29, 2017 we attended for the third time the job fair iKariéra at the Construction Faculty of the Czech Technical University in Prague.

© 2017 COLAS CZ, a.s. All rights reserved