II/351 Třebíč-bridge No. 351-024 & II/351 Třebíč-XRD modification with Jihlavská Brána St. up to I/23 XRD

The project involves the demolition of the old bridge and the construction of a new monolithic, adequately pretensioned double girder frame bridge with a single span in a length of 38.5 m.

Construction period: 2016/05 - 2017/05
Total value of the contract: 49 906 876 CZK excluding VAT

The bridge includes the relaying of high- and low-pressure gas lines, a water main, sewerage line, communications cables, high-voltage cables and the construction of related retaining walls. The surrounding roads in a total length of 700 m will also undergo reconstruction. For the investor, the town of Třebíč, we are modifying the surrounding pavements, public open spaces, public lighting and traffic lights.

COLAS News

Nov 8

General Patton´s Bridge in Plzeň opens to traffic

On Wednesday November 7th, 2018 the General Patton´s Bridge in Plzeň was opened to traffic. The bridge forms part of the main arterial road in the town centre.

Nov 2

Visit to our COLAS colleagues in Hungary

Our colleagues from Bridge and Reinforcement Agency visited two sites in Hungary.

Oct 30

Breakfast with COLAS! - Students of the Dušní Secondary School

Last week we were visited again by students from the 3rd year of the Dušní Secondary School.

Oct 8

Breakfast with COLAS! - Students of the Secondary School of Civil Engineering in Mělník

On Tuesday, September 25th, we visited the 4th and 3rd year students from the Secondary School of Civil Engineering in Mělník

© 2018 COLAS CZ, a.s. All rights reserved