II/351 Třebíč-bridge No. 351-024 & II/351 Třebíč-XRD modification with Jihlavská Brána St. up to I/23 XRD

The project involves the demolition of the old bridge and the construction of a new monolithic, adequately pretensioned double girder frame bridge with a single span in a length of 38.5 m.

Construction period: 2016/05 - 2017/05
Total value of the contract: 49 906 876 CZK excluding VAT

The bridge includes the relaying of high- and low-pressure gas lines, a water main, sewerage line, communications cables, high-voltage cables and the construction of related retaining walls. The surrounding roads in a total length of 700 m will also undergo reconstruction. For the investor, the town of Třebíč, we are modifying the surrounding pavements, public open spaces, public lighting and traffic lights.

COLAS News

May 18

Professional internship from Hungary on the bridges

At the instigation of our talents, we provide internships to share experience between us and sister companies abroad.

May 17

Open Day in Bašnice

The Bašnice profit centre held an open day event on 28 April, 2018.

Apr 26

Marathon in Vienna with the participation of athletes from COLAS CZ

On Sunday, April 22, 2018, a marathon was held in Vienna, where four of our colleagues participated.

Apr 13

Second Corporate meeting of COLAS Group in CZ´s staff

The second Corporate meeting of COLAS CZ Group employees took place on March 20 and 21, 2018, at Hotel Harmony in Špindlerův Mlýn.

© 2018 COLAS CZ, a.s. All rights reserved