II/150 Čechtice – Loket, reconstruction

The reconstruction of this road will homogenize and improve traffic safety and traffic flow. The reconstruction of the bridge structure was performed to increase its load rating.

Construction period: 2014/07 - 2015/08
Total value of the contract: 61 710 461 CZK excluding VAT

The asphalt roadway on the II/150 road was resurfaced between the towns of Čechtice and Loket over a total length of 7,490.0 m. The entire road was reconstructed, including the drainage system, in the urban parts of Čechtice and Křivsoudov. The protected landmark stone arch bridge in the town of Křivsoudov was also reconstructed. Bridge reconstruction was supervised by National Heritage Institute personnel and used original materials. The bridge over Alberovický Brook in the town of Alberovice was demolished and replaced with a new reinforced concrete monolithic framework bridge with a span of 4.5 m that complies with existing Czech technical standards and load-bearing requirements. A culvert in the urban part of Alberovice was reconstructed and a new sidewalk was built in Křivsoudov.

COLAS News

Jun 6

Award for COLAS CZ, a.s. in the 2017 TOP Building Company competition

On June, 2018, Tomáš Krones, Chairman od the Board of Directors of COLAS CZ, received an award for the second place in the 2017 TOP Building Company competition.

May 18

Professional internship from Hungary on the bridges

At the instigation of our talents, we provide internships to share experience between us and sister companies abroad.

May 17

Open Day in Bašnice

The Bašnice profit centre held an open day event on 28 April, 2018.

Apr 26

Marathon in Vienna with the participation of athletes from COLAS CZ

On Sunday, April 22, 2018, a marathon was held in Vienna, where four of our colleagues participated.

© 2018 COLAS CZ, a.s. All rights reserved