II/150 Čechtice – Loket, reconstruction

The reconstruction of this road will homogenize and improve traffic safety and traffic flow. The reconstruction of the bridge structure was performed to increase its load rating.

Construction period: 2014/07 - 2015/08
Total value of the contract: 61 710 461 CZK excluding VAT

The asphalt roadway on the II/150 road was resurfaced between the towns of Čechtice and Loket over a total length of 7,490.0 m. The entire road was reconstructed, including the drainage system, in the urban parts of Čechtice and Křivsoudov. The protected landmark stone arch bridge in the town of Křivsoudov was also reconstructed. Bridge reconstruction was supervised by National Heritage Institute personnel and used original materials. The bridge over Alberovický Brook in the town of Alberovice was demolished and replaced with a new reinforced concrete monolithic framework bridge with a span of 4.5 m that complies with existing Czech technical standards and load-bearing requirements. A culvert in the urban part of Alberovice was reconstructed and a new sidewalk was built in Křivsoudov.

COLAS News

Oct 8

Breakfast with COLAS! - Students of the Secondary School of Civil Engineering in Mělník

On Tuesday, September 25th, we visited the 4th and 3rd year students from the Secondary School of Civil Engineering in Mělník

Sep 14

We like supporting good things!

Since 2002 we have been contributing to the Jihlava Regional Charity which provides assistance and support to people in dire straigths.

Aug 10

Excursion in our quarry

On July 31, 2018, young firemen from Šluknov municipality visited the Šluknov Quarry where an excursion with the head of the quarry was prepared for them.

Jun 6

Award for COLAS CZ, a.s. in the 2017 TOP Building Company competition

On June 4th, 2018, Tomáš Krones, Chairman of the Board of Directors of COLAS CZ, received an award for the second place in the 2017 TOP Building Company competition.

© 2018 COLAS CZ, a.s. All rights reserved