I/47 Slavíč – Bělotín

The I/47 road reconstruction is executed by COLAS CZ, a.s. in consortium with ALPINE Bau CZ a.s.

Construction period: 2016/06 - 2016/11
Total value of the contract: 128 711 475 CZK excluding VAT

The repaired section of the four-lane road is between the municipalities of Slavíč and Bělotín, situated on the main route from Lipník nad Bečvou to Frýdek Místek, with a substantial part of the repaired section running through the city of Hranice.

The subject of the I/47 road reconstruction is the replacement of 140,000 m2 of asphalt road surface. At the same time, the base course in places of insufficient bearing strength and residual service life in a volume of 7,000 m2 is being replaced. The repair also includes the reconstruction of the inner rings in two roundabouts, the laying of 18 km of new soft shoulders, the installation of new crash barriers and implementation of new horizontal road marking.

COLAS News

Apr 18

Ceremonial tapping of the foundation stone for the "D3 highway - Úsilné-Staré Hodějovice section" project

On 17 April, 2019, the Road and Motorway Directorate commenced construction of a part of the České Budějovice bypass, a 7.2 km long section of Úsilné-Staré Hodějovice.

Apr 17

Ceremonial opening of the roundabout in Prague 9

On April 16, 2019 the ceremonial opening of the roundabout Čakovická x Letňanská x Ke Klíčovu, of which we are the contractor, was organized.

Apr 16

ROAD FEST Liberec 2019

The Road Construction Association, of which we are a member, has prepared an experience day for children and parents ROAD FEST. which will take place on May 30, 2019 in Liberec.

Mar 25

2018 Water Management Project - Award for COLAS CZ

Our project "The Biskoupky municipality - Water Supply" was evaluated a "Water Management Project of 2018".

© 2019 COLAS CZ, a.s. All rights reserved