Construction of LINCOLN CZ - extension IV-VI

The project concerned the creation of paved surfaces and roads.

Construction period: 2013/09 - 2014/05
Total value of the contract: 11 814 626 CZK excluding VAT

The work included building new roads, parking spaces, an area for loading and unloading trucks and a retention wall from gabions on the premises of Lincoln CZ s.r.o. The volume of excavation was 9,840 m3. The foundation of roads and surfaces on unsuitable non-supportive sub-base was improved by the modification of the soil by a cinder stabilizer. The total area of the roads covered 6,500 m2, of which 5,380 m2 was concrete surfaces and 1,120 m2 concrete paving. The work also included the construction of a bus shelter in front of the company, Earthworks and horizontal marking.

COLAS News

May 18

Professional internship from Hungary on the bridges

At the instigation of our talents, we provide internships to share experience between us and sister companies abroad.

May 17

Open Day in Bašnice

The Bašnice profit centre held an open day event on 28 April, 2018.

Apr 26

Marathon in Vienna with the participation of athletes from COLAS CZ

On Sunday, April 22, 2018, a marathon was held in Vienna, where four of our colleagues participated.

Apr 13

Second Corporate meeting of COLAS Group in CZ´s staff

The second Corporate meeting of COLAS CZ Group employees took place on March 20 and 21, 2018, at Hotel Harmony in Špindlerův Mlýn.

© 2018 COLAS CZ, a.s. All rights reserved