Construction of LINCOLN CZ - extension IV-VI

The project concerned the creation of paved surfaces and roads.

Construction period: 2013/09 - 2014/05
Total value of the contract: 11 814 626 CZK excluding VAT

The work included building new roads, parking spaces, an area for loading and unloading trucks and a retention wall from gabions on the premises of Lincoln CZ s.r.o. The volume of excavation was 9,840 m3. The foundation of roads and surfaces on unsuitable non-supportive sub-base was improved by the modification of the soil by a cinder stabilizer. The total area of the roads covered 6,500 m2, of which 5,380 m2 was concrete surfaces and 1,120 m2 concrete paving. The work also included the construction of a bus shelter in front of the company, Earthworks and horizontal marking.

COLAS News

Feb 15

COLAS CZ supports EBEC

We decided to support the technical education of students at the Faculty of Civil Engineering of Brno University of Technology and we have become a guarantor of EBEC competition, where students will prove their knowledge in practice.

Feb 13

COLAS Team Cup - final results

The COLAS Team Cup World Finals were held on 7 and 8 February, 2018, in Paris.

Dec 4

COLAS CZ, a.s. at the JobChallenge Job Fair

This year's job fair for students and graduates took place on 22.11.2017 in Brno and our company could not be missed like every year.

Dec 1

Breakfast with COLAS! - Students of the Secondary School of Civil Engineering in Mělník

On Wednesday, 15th November, we welcomed students to the headquarters of the company in Prague. This time visited us students of the 3rd year from Secondary School of Civil Engineering in Mělník.

© 2018 COLAS CZ, a.s. All rights reserved