Area reconstruction of communications in Kunratice municipality

The subject of the contract is the homogenization of the road construction layers.

Construction period: 2017/08 - 2018/05
Total value of the contract: 26 160 708 CZK excluding VAT

The project deals with the renewal of all construction layers of roads and entrances. The surface of communications in the affected area has shown a number of defects, in the form of local dips, flatheads, mosaic, longitudinal, transverse and network cracks. On the roadway, there are also deforestation defects in the form of asphalt cement loss and macro surface texture. Pavement renewal will begin by removing the existing 11 cm thick asphalt cover. In addition, the existing low-quality (fractured) concrete frames will be removed and new curbs will be installed, approximately in the existing position. The base layers will be extracted and taken to the landfill. New gravel structures will be reinforced by geogrids. The height solution is as close as possible to the current state. Any change in height may have an effect on drainage of communications as well as the deterioration of conditions for separate downhill exits to adjacent private land.

COLAS News

Dec 4

Visit to the Polish Rogoźnica quarry

On 8th-9th November, 2018, 4 our colleagues from Quarries Agency, involved in the talent program, took part in the internship at the Rogoźnica quarry.

Nov 8

General Patton´s Bridge in Plzeň opens to traffic

On Wednesday November 7th, 2018 the General Patton´s Bridge in Plzeň was opened to traffic. The bridge forms part of the main arterial road in the town centre.

Nov 2

Visit to our COLAS colleagues in Hungary

Our colleagues from Bridge and Reinforcement Agency visited two sites in Hungary.

Oct 30

Breakfast with COLAS! - Students of the Dušní Secondary School

Last week we were visited again by students from the 3rd year of the Dušní Secondary School.