Highway engineering

Reference filter
2015/04 - 2017/11
main-img20160816094025-666.jpg

I/34 Božejov–Ondřejov–Pelhřimov

Construction of the Ondřejov and Ústrašín bypass on class I road 34 has continued in 2016 and is currently the largest new transport infrastructure project in the Vysočina region.
2017/06 - 2017/11
main-img20171030113829hdr-1056.jpg

Žernov 2 dirt road

The project documentation deals with the construction of two rural roads and landscaping of adjacent areas.
2017/07 - 2017/10
main-stonarov-dlouha-brtnice-14-960.jpg

I/38 Stonařov-Dlouhá Brtnice

Reconstruction of the 1st class road.
2016/08 - 2017/07
main-20160908001-817.jpg

III/27935 Sobotka – Podkost

Reconstruction of road III/27935 between Sobotka and Podkost in the length of 3,555.7 m including reconstruction of culverts and repair of road edges.
2016/08 - 2017/06
main-20160905084631-752.jpg

D10 median strip modification

In this project, COLAS CZ is installing 19 median strip crossings in lengths of 120 and 135 m.
2016/03 - 2017/06
main-img201604130647-779.JPG

Henčov sewerage line and wastewater treatment plant

The subject of the work is the construction of a new wastewater treatment plant (WWTP) and sewerage line in a length of 1,261 m, including branches, in the Henčov section of the city of Jihlava.
2016/10 - 2017/05
main-dscf1007-833.JPG

II/324 Prasek – crossroads with the III/324 24 road

The II/324 roadway is of regional significance, it connects individual cities in the region and is a utilized alternative to the highway as well as the I/11 Prague – Hradec Králové roadway.
2016/05 - 2017/05
main-img4753-782.JPG

II/351 Třebíč-bridge No. 351-024 & II/351 Třebíč-XRD modification with Jihlavská Brána St. up to I/23 XRD

The project involves the demolition of the old bridge and the construction of a new monolithic, adequately pretensioned double girder frame bridge with a single span in a length of 38.5 m.
Pagination
« 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 »

COLAS News

May 13

"My dad works here!" campaign

On May 13, 2019, a "My dad works here" campaign was launched within the COLAS Europe Group.

May 6

Open Day in Bystřice n. P.

On Saturday, May 4, the Bystřice nad Pernštejnem HAMP held the Open Day event.

Apr 18

Ceremonial tapping of the foundation stone for the "D3 highway - Úsilné-Staré Hodějovice section" project

On 17 April, 2019, the Road and Motorway Directorate commenced construction of a part of the České Budějovice bypass, a 7.2 km long section of Úsilné-Staré Hodějovice.

Apr 17

Ceremonial opening of the roundabout in Prague 9

On April 16, 2019 the ceremonial opening of the roundabout Čakovická x Letňanská x Ke Klíčovu, of which we are the contractor, was organized.

© 2019 COLAS CZ, a.s. All rights reserved