Highway engineering

Reference filter
2012/10 - 2014/09
main-revitalizace-verejnych-prostranstvi-337.jpg

Revitalization of public areas in Znojmo

The project concerned the reconstruction of the transport and technical infrastructure, public lighting, revitalization of public greenery, purchasing and restoration of the street furniture in Znojmo – Přímětice.
2014/03 - 2014/08
main-ii276-bakov-nad-jizerou-knezmost-rekonstrukce-silnice-493.jpg

II/276 Bakov nad Jizerou – Kněžmost, road reconstruction

The project concerned reconstruction of road II/276 between Bakov nad Jizerou and Kněžmost in a length of 7.078 km.
2013/11 - 2014/07
main-rekonstrukce-ulice-28-rijna-a-rekonstrukce-ulice-dr-e-benese-neratovice-410.jpg

Reconstruction of 28. října St. and reconstruction of Dr. E. Beneše St., Neratovice

Reconstruction of a street space with the local repair of the whole layer system, reconstruction and creation of new pavements, entrances, parking spaces and bus bays.
2013/09 - 2014/05
main-vystavba-lincoln-cz-rozsireni-iv-vi-303.jpg

Construction of LINCOLN CZ - extension IV-VI

The project concerned the creation of paved surfaces and roads.
2013/04 - 2014/05
main-c-4-11-2013-18-800-254.jpg

II/405 Zašovice - Okříšky

Complete reconstruction of a class II, S 9,5 category road in a length of 1.9 km.
2013/06 - 2014/05
main-obnova-silnice-po-povodnich-ii290-frydlant-bily-potok-i-etapa-270.JPG

Restoration of road after the 2010 flood, II/290 Frýdlant – Bílý Potok (stage I)

Reconstruction or road II/290 in the Liberec Region between Frýdland and Bílý Potok, which was damaged or completely destroyed by the flood in August 2010.
2013/10 - 2014/04
main-2-1-800-266.jpg

Service road for the Vazačka industrial zone in Bělá pod Bezdězem – road 110c

The project concerned the construction of a service road for the industrial zone in a length of 1.004 km.
2013/10 - 2013/12
main-ii400-hostim-rozkos-327.jpg

II/400 Hostim - Rozkoš

The reconstruction of the road involved the repair of potholes and depressions and the subsequent strengthening of the surface with a 10 cm layer of asphalt-concrete.
Pagination
« 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 »

COLAS News

Apr 13

Second Corporate meeting of COLAS Group in CZ´s staff

The second Corporate meeting of COLAS CZ Group employees took place on March 20 and 21, 2018, at Hotel Harmony in Špindlerův Mlýn.

Feb 15

COLAS CZ supports EBEC

We decided to support the technical education of students at the Faculty of Civil Engineering of Brno University of Technology and we have become a guarantor of EBEC competition, where students will prove their knowledge in practice.

Feb 13

COLAS Team Cup - final results

The COLAS Team Cup World Finals were held on 7 and 8 February, 2018, in Paris.

Dec 4

COLAS CZ, a.s. at the JobChallenge Job Fair

This year's job fair for students and graduates took place on 22.11.2017 in Brno and our company could not be missed like every year.

© 2018 COLAS CZ, a.s. All rights reserved