Štěrboholská connecting road – Fire Station Dolní Počernice

The aim of the project is to ensure the protection of the area in Dolní Počernice and Štěrboholská against noise from Štěrboholská connecting road.

Construction period: 2016/12 - 2017/10
Total value of the contract: 75 378 216 CZK excluding VAT

Within the framework of the project, reconstruction of the existing noise barrier in Štěrboholská connecting road in the section between the bridge on U Konečné in the direction to the city centre over Národních hrdinů and Nedokončená street up to the existing Agip petrol station will be executed. At the same time, completion of the missing part of the noise barrier in the area between the existing fire station and the bridge over Štěrboholská connecting road (U Konečné street) will be performed.

Noise barrier is designed from aluminium panels, the lower part is made of prefabricated reinforced concrete plinth panel.

The total length of the barrier is 3.2 km, the height is 3.5 m.

COLAS News

Apr 13

Second Corporate meeting of COLAS Group in CZ´s staff

The second Corporate meeting of COLAS CZ Group employees took place on March 20 and 21, 2018, at Hotel Harmony in Špindlerův Mlýn.

Feb 15

COLAS CZ supports EBEC

We decided to support the technical education of students at the Faculty of Civil Engineering of Brno University of Technology and we have become a guarantor of EBEC competition, where students will prove their knowledge in practice.

Feb 13

COLAS Team Cup - final results

The COLAS Team Cup World Finals were held on 7 and 8 February, 2018, in Paris.

Dec 4

COLAS CZ, a.s. at the JobChallenge Job Fair

This year's job fair for students and graduates took place on 22.11.2017 in Brno and our company could not be missed like every year.

© 2018 COLAS CZ, a.s. All rights reserved