Štěrboholská connecting road – Fire Station Dolní Počernice

The aim of the project is to ensure the protection of the area in Dolní Počernice and Štěrboholská against noise from Štěrboholská connecting road.

Construction period: 2016/12 - 2017/10
Total value of the contract: 75 378 216 CZK excluding VAT

Within the framework of the project, reconstruction of the existing noise barrier in Štěrboholská connecting road in the section between the bridge on U Konečné in the direction to the city centre over Národních hrdinů and Nedokončená street up to the existing Agip petrol station will be executed. At the same time, completion of the missing part of the noise barrier in the area between the existing fire station and the bridge over Štěrboholská connecting road (U Konečné street) will be performed.

Noise barrier is designed from aluminium panels, the lower part is made of prefabricated reinforced concrete plinth panel.

The total length of the barrier is 3.2 km, the height is 3.5 m.

COLAS News

Jun 30

COLAS Team Cup - qualification five-a-side soccer

This year, Mr. Hervé Le Bouc, CEO and Chairman of the COLAS Management Board, decided to create a worldwide in-house sports event, called Colas Team Cup. Two sport were chosen - five-a-side soccer and running.

Apr 19

COLAS CZ, a.s. and Čermák and Hrachovec a.s. at the iKariéra 2017 Job Fair in Brno

On April 11, 2017 we attended the job fair iKariéra at the Faculty of Business and Management at the University of Technology in Brno.

Apr 6

COLAS CZ, a.s. and Čermák a Hrachovec a.s. at the iKariéra 2017 Job Fair in Prague

On March 29, 2017 we attended for the third time the job fair iKariéra at the Construction Faculty of the Czech Technical University in Prague.

Apr 4

Our company participates in the reconstruction of two D1 highway sections.

“D1 modernization – section 10, EXIT 75 Hořice – EXIT 81 Koberovice” and “D1 modernization – section 20, EXIT 146 V. Meziříčí – EXIT 153 Lhotka”

© 2017 COLAS CZ, a.s. All rights reserved