Reconstruction of bridge Reg. No. 1911 – 3, Krásný Les

The Reg. No. 2911-3 bridge over the Řasnice River in Krásný Les was severely damaged during the floods in 2010 and traffic had to be heavily restricted.

Construction period: 2012/05 - 2012/11
Total value of the contract: 8 430 581 CZK excluding VAT

The work involved the demolition of the original support structure and the lower structure to the level of the watercourse bed and the subsequent construction of a new bridge. The preserved parts of the foundation were reinforced by micro-piles on which massive reinforced concrete supports were poured. The support structure is a collar beam structure from monolithic concrete. The total length of the bridge is 14.5 m, the width 8.85 m, the height 3.01 m. It covers an area of 114.3 m2.

The contractor's delivery also included complete insulation, the roadway layer system and bridge accessories. The stone paving of the watercourse bed was also repaired to a large extent.

COLAS News

Jun 6

Award for COLAS CZ, a.s. in the 2017 TOP Building Company competition

On June, 2018, Tomáš Krones, Chairman od the Board of Directors of COLAS CZ, received an award for the second place in the 2017 TOP Building Company competition.

May 18

Professional internship from Hungary on the bridges

At the instigation of our talents, we provide internships to share experience between us and sister companies abroad.

May 17

Open Day in Bašnice

The Bašnice profit centre held an open day event on 28 April, 2018.

Apr 26

Marathon in Vienna with the participation of athletes from COLAS CZ

On Sunday, April 22, 2018, a marathon was held in Vienna, where four of our colleagues participated.

© 2018 COLAS CZ, a.s. All rights reserved