I/26 Plzeň, Letná bridges – serial no. 26-009..1 and 2

The project involves the gradual reconstruction of a pair of motorway bridges over the Úslava River along the main route out of the city centre in Plzeň on the D5 motorway exit.

Construction period: 2015/05 - 2016/12
Total value of the contract: 62 292 000 CZK excluding VAT

Demolition of the existing bridge structures was completed, followed by pillar demolition, which exposed the foundation structure. Repairs were made to the abutments, new pillars were installed on the original foundation structure and new bridge structures were erected. The project involves extensions to roughly 10 utility system networks. This required the construction of temporary structures. It was also necessary to move a gas main away from the bridge construction site, which resulted in the construction of a separate bridging structure between the bridges.


Feb 15

COLAS CZ supports EBEC

We decided to support the technical education of students at the Faculty of Civil Engineering of Brno University of Technology and we have become a guarantor of EBEC competition, where students will prove their knowledge in practice.

Feb 13

COLAS Team Cup - final results

The COLAS Team Cup World Finals were held on 7 and 8 February, 2018, in Paris.

Dec 4

COLAS CZ, a.s. at the JobChallenge Job Fair

This year's job fair for students and graduates took place on 22.11.2017 in Brno and our company could not be missed like every year.

Dec 1

Breakfast with COLAS! - Students of the Secondary School of Civil Engineering in Mělník

On Wednesday, 15th November, we welcomed students to the headquarters of the company in Prague. This time visited us students of the 3rd year from Secondary School of Civil Engineering in Mělník.

© 2018 COLAS CZ, a.s. All rights reserved