Our works

Reference filter
2014/09 - 2015/09
main-kanalizace-a-cov-puklice-617.jpg

Puklice sewerage system and wastewater treatment plant

The project involved the construction of a gravity sanitary sewerage system in the towns of Puklice and Studénky.
2015/04 - 2015/09
main-rekonstrukce-mistnich-komunikaci-2014-2-etapa-415.jpg

Reconstruction of local roads 2014 - 2nd stage

The project concerned the reconstruction of roads and part of pavements in the streets Dlouhá, Střední, Střední, Na Vodě, Ke dráze, Třeboradická, Slepá, Zahradní, U parku, Spojka Revoluční – U kostela, Hovorčovice.
2013/09 - 2015/09
main-sv-ivancice-rosice-zajisteni-kvality-pitne-vody-633.jpg

Water supplies for Ivančice – Rosice, drinking water quality assurance

The implementation of the “Water supplies for Ivančice – Rosice, drinking water quality assurance” project provides adequate amounts of drinking water for the development of all 28 towns in the Ivančice Union of Water and Sewerage Lines and for nearly 30,000 residents.
2014/03 - 2015/08
main-most-ev-c-159-009-drachov-625.jpg

Bridge no. 159-009 in Dráchov

The project involved the reconstruction of the road bridge.
2015/07 - 2015/08
main-i22-drazenov-423.jpg

I/22 Draženov

The full-area repair of road I/22 involved the section from a roundabout and exit from road I/26, the road through the town and behind the Draženov town limit sign in a total length of 1,023 m.
2014/07 - 2015/08
main-wp20150921011-826.jpg

II/150 Čechtice – Loket, reconstruction

The reconstruction of this road will homogenize and improve traffic safety and traffic flow. The reconstruction of the bridge structure was performed to increase its load rating.
2015/07 - 2015/08
main-ii193-domazlice-havlovice-x-i26-378.jpg

II/193 Domažlice - Havlovice - X I/26

The project concerned reconstruction of road II/193 from the end of Domažlice to the beginning of Havlovice in a length of 1,377 m and from the end of Havlovice to the junction with road I/26 in the direction to Folmava in a length of 677 m.
Pagination

COLAS News

May 13

"My dad works here!" campaign

On May 13, 2019, a "My dad works here" campaign was launched within the COLAS Europe Group.

May 6

Open Day in Bystřice n. P.

On Saturday, May 4, the Bystřice nad Pernštejnem HAMP held the Open Day event.

Apr 18

Ceremonial tapping of the foundation stone for the "D3 highway - Úsilné-Staré Hodějovice section" project

On 17 April, 2019, the Road and Motorway Directorate commenced construction of a part of the České Budějovice bypass, a 7.2 km long section of Úsilné-Staré Hodějovice.

Apr 17

Ceremonial opening of the roundabout in Prague 9

On April 16, 2019 the ceremonial opening of the roundabout Čakovická x Letňanská x Ke Klíčovu, of which we are the contractor, was organized.