Our works

Reference filter
2016/12 - 2017/10
main-img20170303101430-911.jpg

Štěrboholská connecting road – Fire Station Dolní Počernice

The aim of the project is to ensure the protection of the area in Dolní Počernice and Štěrboholská against noise from Štěrboholská connecting road.
2017/07 - 2017/10
main-stonarov-dlouha-brtnice-14-960.jpg

I/38 Stonařov-Dlouhá Brtnice

Reconstruction of the 1st class road.
2016/08 - 2017/07
main-20160908001-817.jpg

III/27935 Sobotka – Podkost

Reconstruction of road III/27935 between Sobotka and Podkost in the length of 3,555.7 m including reconstruction of culverts and repair of road edges.
2016/08 - 2017/06
main-20160905084631-752.jpg

D10 median strip modification

In this project, COLAS CZ is installing 19 median strip crossings in lengths of 120 and 135 m.
2016/03 - 2017/06
main-img201604130647-779.JPG

Henčov sewerage line and wastewater treatment plant

The subject of the work is the construction of a new wastewater treatment plant (WWTP) and sewerage line in a length of 1,261 m, including branches, in the Henčov section of the city of Jihlava.
2016/10 - 2017/05
main-dscf1007-833.JPG

II/324 Prasek – crossroads with the III/324 24 road

The II/324 roadway is of regional significance, it connects individual cities in the region and is a utilized alternative to the highway as well as the I/11 Prague – Hradec Králové roadway.
2016/05 - 2017/05
main-img4753-782.JPG

II/351 Třebíč-bridge No. 351-024 & II/351 Třebíč-XRD modification with Jihlavská Brána St. up to I/23 XRD

The project involves the demolition of the old bridge and the construction of a new monolithic, adequately pretensioned double girder frame bridge with a single span in a length of 38.5 m.
2017/03 - 2017/05
main-cimg9195-963.JPG

Škoda Auto - new M11C painting shop - Layby areas 1, 2

Work description: rainwater drainage, public lighting, construction of pavement for layby areas, guardrails etc.
Pagination

COLAS News

Jun 17

Soutice HAMP given a new look

As part of the safety campaign "My Dad Works Here!" and, at the same time, to commemorate this year's 25th anniversary of COLAS in the Czech Republic, we have equipped our HAMP in Soutice with new branding.

Jun 13

COLAS CZ performs local repairs on the D1 motorway near Bohumín

COLAS CZ is executing works on the "D1 local AB repairs in km 356-370 left + right" project.

Jun 6

Our company participates in the construction of Velký Beranov bypass (Vysočina Region)

COLAS CZ is a member of a "Velký Beranov ECS + COLAS Company" consortium of companies with a 50% share.

May 13

"My dad works here!" campaign

On May 13, 2019, a "My dad works here" campaign was launched within the COLAS Europe Group.

© 2019 COLAS CZ, a.s. All rights reserved