Our works

Reference filter
main-d47082-oprava-mostu-so-228-a-so-229-543.jpg

Bridges and the highway approach road in Ostrava-Přívoz are open for traffic again

The Road and Motorway Directorate opened them on 2 November 2015 before 9:30 a.m. after repairs, due to which they were closed from the end of May. The traffic had already been restricted there for several months before the closing.
main-slavnostni-dokonceni-stavby-rtt-stresovicka-na-petrinach-433.jpg

Ceremonial completion of the RTT Střešovická project

On Friday, 30 October 2015, the RTT Střešovická was put in service following the ceremonial tape cutting.
main-foto1-438.jpg

Ceremonial opening of the modified asphalt centre ASTECH

COLAS CZ, a.s. ceremoniously opened a new centre for the production of ASTECH modified asphalt on the grounds of its own asphalt centre in Holubice u Brna. The event took place on Thursday, 5 November 2015.
main-slavnostni-zahajeni-provozu-na-zrekonstruovane-trati-do-jablonce-384.jpg

Ceremonial opening of the reconstructed tramway line to Jablonec

With the cutting of the tape on Saturday 22 August, the intercity tramway line No. 11 Liberec – Jablonec nad Nisou was ceremonially handed over to the public after the modernization of two sections, Nová Ruda – Vratislavice nad Nisou, Výhybna and Měnírna - Brandl.
main-prestupni-terminal-trebic-350.jpg

Ceremonial opening of the Třebíč changing terminal

The "Třebíč changing terminal", for almost CZK 140 million, was ceremonially opened on 29 May 2015
main-slavnostni-poklepani-zakladniho-kamene-2152015-345.jpg

Ceremonial tapping of the foundation stone for the "I/26 Plzeň, mosty Letná" project

On Thursday, 21 May, the Road and Motorway Directorate began construction of two bridges on route I/26 in Rokycanská St., Plzeň
main-img1062-800-317.jpg

Ceremonial tapping of the foundation stone of the "Silnice I/34 Božejov-Ondřejov-Pelhřimov“ project

On Thursday, 16 April, the Road and Motorway Directorate started construction of a bypass of route I/34 Božejov – Ondřejov – Pelhřimov, which was attended by Jan Kroupa, general director of the Road and Motorway Directorate
main-12-maraton-ceske-budejovice-357.jpg

České Budějovice Half Marathon attended by COLAS CZ, a.s.

COLAS CZ, a.s. secured closure of the Half Marathon route in České Budějovice
Pagination

COLAS News

May 13

"My dad works here!" campaign

On May 13, 2019, a "My dad works here" campaign was launched within the COLAS Europe Group.

May 6

Open Day in Bystřice n. P.

On Saturday, May 4, the Bystřice nad Pernštejnem HAMP held the Open Day event.

Apr 18

Ceremonial tapping of the foundation stone for the "D3 highway - Úsilné-Staré Hodějovice section" project

On 17 April, 2019, the Road and Motorway Directorate commenced construction of a part of the České Budějovice bypass, a 7.2 km long section of Úsilné-Staré Hodějovice.

Apr 17

Ceremonial opening of the roundabout in Prague 9

On April 16, 2019 the ceremonial opening of the roundabout Čakovická x Letňanská x Ke Klíčovu, of which we are the contractor, was organized.

© 2019 COLAS CZ, a.s. All rights reserved