Our works

Reference filter
2009/02 - 2011/11
main-4g2i6255-231.jpg

Road I/58 Příbor – bypass

Construction of the Příbor road bypass in a length of 6.13 km, construction of a four-lane concrete road in a length of 1.85 km.
2011/04 - 2011/10
main-img2885-212.JPG

Parking area for finished cars Škotrans

The project concerned construction of a new area with an asphalt surface for the temporary parking of new cars before their shipment.
2009/04 - 2010/10
main-pict0010-291.JPG

Relocation of route II/352 Jihlava – Heroltice

Construction of a new class II, S 9,5 category road in a total length of 3 km
2009/10 - 2009/11
main-d1-1-196.JPG

Repair of AB roadway of D1 highway, km 59.105 - 62.043 on the right

Restoration of the road surface, including recycling of the cement stabilisation
2008/07 - 2008/12
main-dokoncena-stavba-230.jpg

I/16 border of the Jičín and Mladá Boleslav district - bypass of Sobotka - Samšina - Ohařice

Restoration of the asphalt surface of road I/16 from the border of the Jičín and Mladá Boleslav districts to the junction of route I/16 with III/28016 Jičín.
2006/11 - 2008/07
main-lbc-2-206.jpg

New road - Liberec, Kunratická

The project concerned construction of a new S22,5/80 category road in a length of 2,299 m.
2007/10 - 2008/05
main-image001jpg-168.jpg

Construction: road I/36 through Voleč – asphalt surface restoration

Route I/36 is the main road between Pardubice and Chlumec nad Cidlinou.
2008/04 - 2008/05
main-336-bezdekov-005-1jpg-171.jpg

Repair of road II / 336 - Soutice

The investor was the Central Bohemian Region
Pagination

COLAS News

May 13

"My dad works here!" campaign

On May 13, 2019, a "My dad works here" campaign was launched within the COLAS Europe Group.

May 6

Open Day in Bystřice n. P.

On Saturday, May 4, the Bystřice nad Pernštejnem HAMP held the Open Day event.

Apr 18

Ceremonial tapping of the foundation stone for the "D3 highway - Úsilné-Staré Hodějovice section" project

On 17 April, 2019, the Road and Motorway Directorate commenced construction of a part of the České Budějovice bypass, a 7.2 km long section of Úsilné-Staré Hodějovice.

Apr 17

Ceremonial opening of the roundabout in Prague 9

On April 16, 2019 the ceremonial opening of the roundabout Čakovická x Letňanská x Ke Klíčovu, of which we are the contractor, was organized.

© 2019 COLAS CZ, a.s. All rights reserved