Our works

Reference filter
2013/08 - 2013/12
main-sidliste1-257.jpg

Prague Housing Estate in Tábor – stage VII of regeneration

The project concerned the removal of old and the construction of new roads, car parks and pavements.
2013/08 - 2013/10
main-dscf0367-800-300.jpg

II/404, III/4045 Komárovice - junction III/4045

Complete reconstruction of the junction of class II and III roads in a rural area, implemented in stages in partial traffic.
2013/09 - 2013/09
main-cukrovarnadrzbigjpg-148.jpg

Implementation of a sedimentation tank for a sugar refinery water treatment centre

Landscaping and dykes, feed-pipe, rack tank with the racks, pumping station.
2013/05 - 2013/09
main-malesice-222.jpg

Repair of a breast wall on the Praha Malešice - Praha Libeň railway line

Reinforced concrete breast wall, anchorage in the rock, drainage of the line, landscaping.
2012/08 - 2013/08
main-p1020301-800-294.jpg

II/404 Road through Luka nad Jihlavou

The reconstruction of the road involved a change of the surface and base course.
2012/05 - 2012/11
main-rekonstrukce-mostu-evc1911-3-krasny-les-398.jpg

Reconstruction of bridge Reg. No. 1911 – 3, Krásný Les

The Reg. No. 2911-3 bridge over the Řasnice River in Krásný Les was severely damaged during the floods in 2010 and traffic had to be heavily restricted.
2012/05 - 2012/11
main-mozartova-1-184.jpg

Lesní St. - repair of roads – stage I

The public tender involved the complete reconstruction of Mozartova and Javorová streets in the centre of Liberec.
2012/06 - 2012/10
main-most-pres-reku-svitavku-evc-26844-2-389.jpg

Bridge over the Svitávka River Reg. No. 26844-2

The project involved the replacement of the existing stone vault bridge in critical condition with a new bridge, thus providing a safe traffic connection between Dolní and Horní Světlá.
Pagination

COLAS News

Jun 17

Soutice HAMP given a new look

As part of the safety campaign "My Dad Works Here!" and, at the same time, to commemorate this year's 25th anniversary of COLAS in the Czech Republic, we have equipped our HAMP in Soutice with new branding.

Jun 13

COLAS CZ performs local repairs on the D1 motorway near Bohumín

COLAS CZ is executing works on the "D1 local AB repairs in km 356-370 left + right" project.

Jun 6

Our company participates in the construction of Velký Beranov bypass (Vysočina Region)

COLAS CZ is a member of a "Velký Beranov ECS + COLAS Company" consortium of companies with a 50% share.

May 13

"My dad works here!" campaign

On May 13, 2019, a "My dad works here" campaign was launched within the COLAS Europe Group.

© 2019 COLAS CZ, a.s. All rights reserved