Our works

Reference filter
2014/03 - 2014/08
main-ii276-bakov-nad-jizerou-knezmost-rekonstrukce-silnice-493.jpg

II/276 Bakov nad Jizerou – Kněžmost, road reconstruction

The project concerned reconstruction of road II/276 between Bakov nad Jizerou and Kněžmost in a length of 7.078 km.
2013/11 - 2014/07
main-rekonstrukce-ulice-28-rijna-a-rekonstrukce-ulice-dr-e-benese-neratovice-410.jpg

Reconstruction of 28. října St. and reconstruction of Dr. E. Beneše St., Neratovice

Reconstruction of a street space with the local repair of the whole layer system, reconstruction and creation of new pavements, entrances, parking spaces and bus bays.
2013/05 - 2014/05
main-mestsky-okruh-domazlicka-krimicka-v-plzni-so-221-nadjezd-v-km-2106-386.jpg

Urban ring Domažlická – Křimická in Plzeň, SO 221 flyover on km 2.106

The flyover takes the new road over the newly constructed urban ring.
2013/09 - 2014/05
main-vystavba-lincoln-cz-rozsireni-iv-vi-303.jpg

Construction of LINCOLN CZ - extension IV-VI

The project concerned the creation of paved surfaces and roads.
2013/04 - 2014/05
main-c-4-11-2013-18-800-254.jpg

II/405 Zašovice - Okříšky

Complete reconstruction of a class II, S 9,5 category road in a length of 1.9 km.
2013/06 - 2014/05
main-obnova-silnice-po-povodnich-ii290-frydlant-bily-potok-i-etapa-270.JPG

Restoration of road after the 2010 flood, II/290 Frýdlant – Bílý Potok (stage I)

Reconstruction or road II/290 in the Liberec Region between Frýdland and Bílý Potok, which was damaged or completely destroyed by the flood in August 2010.
2013/10 - 2014/04
main-2-1-800-266.jpg

Service road for the Vazačka industrial zone in Bělá pod Bezdězem – road 110c

The project concerned the construction of a service road for the industrial zone in a length of 1.004 km.
2013/10 - 2013/12
main-ii400-hostim-rozkos-327.jpg

II/400 Hostim - Rozkoš

The reconstruction of the road involved the repair of potholes and depressions and the subsequent strengthening of the surface with a 10 cm layer of asphalt-concrete.
Pagination

COLAS News

Dec 4

Visit to the Polish Rogoźnica quarry

On 8th-9th November, 2018, 4 our colleagues from Quarries Agency, involved in the talent program, took part in the internship at the Rogoźnica quarry.

Nov 8

General Patton´s Bridge in Plzeň opens to traffic

On Wednesday November 7th, 2018 the General Patton´s Bridge in Plzeň was opened to traffic. The bridge forms part of the main arterial road in the town centre.

Nov 2

Visit to our COLAS colleagues in Hungary

Our colleagues from Bridge and Reinforcement Agency visited two sites in Hungary.

Oct 30

Breakfast with COLAS! - Students of the Dušní Secondary School

Last week we were visited again by students from the 3rd year of the Dušní Secondary School.

© 2018 COLAS CZ, a.s. All rights reserved