Our works

Reference filter
2018/10 - 2020/10

Luka nad Jihlavou, construction of sewerage system

Construction of the sewerage system and reconstruction of the rainwater drainage in the Čs. Armády, Zahradní, Polní, Nová, Revoluční, Družby, Lidická and Školní streets with connection to the existing sewerage in Luka nad Jihlavou municipality
2018/05 - 2019/10
main-eletava-hranice-kraje-1-1093.jpg

I/38 Želetava - border of the region

Reconstruction of 13.5 km long 1st class roadway in the section between the villages Želetava - Zvěrkovice.
2018/08 - 2019/09
main-hangar-c-a-d-letiste-vaclava-havla-4-1165.JPG

Repair of handling area in front of a D Hangar and reconstruction of roadway between C and D Hangars

Reconstruction of the asphalt cover in the handling area in front of the D Hangar at Václav Havel Airport in Ruzyně.
2017/04 - 2019/06
main-20170117132557-901.jpg

General Patton´s Bridge in Plzeň

On May 2nd, 1973, a new bridge, today General Patton´s Bridge, over the river Mže, was put into operation. The bridge helped divert the transit traffic from the square in the direction of Karlovy Vary and Žatec.
2018/04 - 2019/06
main-img20180731090200-1122.jpg

Sadová residential complex - main roads and utility networks - section E

Section E is part of the extensive system of roadways and utility networks of the Sadová residential complex. The construction includes a basic roadway system and engineering network routes.
2017/10 - 2019/02
main-img20180827133602-1142.jpg

Staré Bohnice 1st stage Bohnická – Ústavní – K Farkám and their vicinity, project No. 999229/1, Praha 8

Within the first stage, the roads will be reconstructed in Bohnická, Ústavní, Nové Butovice, Na Bendovce, U Pazderek, K Farkám streets and the connection between the streets K Farkám and Bohnická in Praha 8 will be executed.
2017/11 - 2018/11
main-img20180514162955-1137.jpg

Husitská, Praha 3

The project includes reconstruction of the street area. The pavement design is designed for class III of the traffic signing with an asphalt cover with increased stiffness.
2018/06 - 2018/10
main-20180618100737-1128.jpg

I/10 Mýtiny, bridge 10-078

The bridge taking the I/10 road through the confluence of the Mumlava and Milnice rivers, consists of two plain fields. The total length of the supporting structure is 71.5 m.
Pagination

COLAS News

May 13

"My dad works here!" campaign

On May 13, 2019, a "My dad works here" campaign was launched within the COLAS Europe Group.

May 6

Open Day in Bystřice n. P.

On Saturday, May 4, the Bystřice nad Pernštejnem HAMP held the Open Day event.

Apr 18

Ceremonial tapping of the foundation stone for the "D3 highway - Úsilné-Staré Hodějovice section" project

On 17 April, 2019, the Road and Motorway Directorate commenced construction of a part of the České Budějovice bypass, a 7.2 km long section of Úsilné-Staré Hodějovice.

Apr 17

Ceremonial opening of the roundabout in Prague 9

On April 16, 2019 the ceremonial opening of the roundabout Čakovická x Letňanská x Ke Klíčovu, of which we are the contractor, was organized.